Work-front-sequenced material logistics
Construction logistics coordinates cement, steel, aggregates, and fit-out materials across vendor yards, batching plants, and active project sites. Every delivery is tied to a work-front schedule, and a late arrival stalls the crew behind it. Inbound scheduling, gate throughput, and vendor-to-site tracking need to align against shifting pour schedules and subcontractor dependencies.
Material arrivals are timed to purchase order dates rather than site work-front readiness, causing trucks to queue at congested gates.
Vendor-to-site visibility runs on phone calls, and the team plans around estimated arrival times rather than live location.
Ready-mix and concrete deliveries are pour-slot dependent, and a delay of even 30 minutes can waste a full crew commitment.
Freight invoices are reconciled against manual gate records, and quantity variances reach finance weeks after delivery.
Enmovil coordinates construction material logistics through CADDIE, its AI-powered intelligence layer, sequencing every delivery to the work front with full visibility from vendor yard to gate.
Sequences material arrivals against site work-front readiness and gate throughput, reducing truck queuing and detention costs.
Tracks every vehicle from yard to site entry in real time, so site engineers see live ETAs rather than estimates.
Alerts the site supervisor when a time-critical delivery deviates from its scheduled slot, with enough lead time to adjust crew staging.
Captures geo-stamped, quantity-verified proof at the gate and closes the inbound record before the vendor invoice is raised.
Deliveries timed to PO dates rather than site readiness cause trucks to queue at gates, with detention charges accumulating across dozens of daily movements.
Inbound Scheduling sequences arrivals against the work-front calendar and gate throughput. CADDIE surfaces congestion signals in time for the site team to stagger arrivals.
Ready-mix pour-slot delays commit a crew to idle time, and the site supervisor gets no signal until the driver calls.
Multi-modal Visibility tracks every vehicle in real time with 97% ETA accuracy. CADDIE alerts the supervisor the moment a pour-slot delivery deviates from schedule.
Freight settlement depends on manual gate records, and variances or detention claims reach finance weeks after delivery.
ePOD captures geo-tagged, quantity-verified proof at the gate. AI Freight Settlement flags variances against the vendor invoice before finance approves payment.
lower site detention costs
on-time delivery for concrete & steel
invoice dispute resolution
from 22 days
A top-5 infrastructure developer reduced site detention costs by 34%, achieved 96% on-time delivery for concrete and structural steel, and cut invoice dispute resolution from 22 days to under 48 hours across 7 project sites.
Live within 10 weeks
Still weighing a rollout? Talk to our team about how this maps to your network.
Inbound Scheduling sequences material arrivals against the site work-front calendar and gate throughput instead of purchase-order dates. CADDIE surfaces congestion signals early enough for the site team to stagger arrivals, which cut detention costs by 34% in production.