Constraint-Aware Production Planning for a Tier-1 Automotive Components Manufacturer

A Tier-1 automotive components manufacturer raised machine utilisation from 63% to 92%, improved OEM on-time delivery to 97%, and reduced planning cycle time from hours to minutes.

intelligent production planning

Industry: Automotive Components

Flows: Plastic Injection Moulding

Complexity: 24 Machines · 2 –Shift Operation

Scale: Multi-OEM · Multi-Variant

Previous: Manual Spreadsheet Scheduling

Impact At a Glance:

+29pp

+38%

97%

98%

Machine Utilisation

Improvement

63% to 92% on the

existing asset base


Throughput Gain per Shift

Without adding

machines or

headcount

On-Time OEM

Delivery Rate

Up from 74% across all

committed windows

Planning Cycle Time

Reduction

From 5–7 hours to

under 5 minutes


BACKGROUND & SITUATION

The Operating Environment:

A Tier-1 automotive components supplier operates a 24-machine plastic injection moulding facility serving multiple OEM customers across passenger vehicle, commercial vehicle, and two-wheeler segments. Each machine is qualified for specific part mould combinations; parts differ in cycle time, raw material (RM) colour, shot weight, and OEM family assignment.With committed delivery windows per OEM, shared bay cranes for mould changeovers, and a two-shift continuous operation, the facility's planning team struggled to produce a feasible, optimised daily schedule that respected all constraints simultaneously. A single missed mould changeover sequence or unrecovered idle gap could cascade into missed OEM commitments and emergency overtime.

TRIGGER FOR CHANGE

The Need for Change

The client engaged Enmovil to deploy its Intelligent Production Planning platform

replacing manual spreadsheet scheduling with a constraint-aware, solver-driven

system that plans across all machines, moulds, OEM windows, and shift states in a

single run.

THE CHALLENGE

Key Barriers to Operational Excellence

Compounding operational barriers across the planning workflow that slowed cycles, eroded service, and inflated cost.

No Unified Scheduling Model

Machine capacity, mould compatibility, RM colour sequencing, and OEM delivery
windows lived in three disconnected tools planners had no single feasible-and-optimised view.

Bay Crane Contention

A single shared crane per bay served multiple machines for mold changeovers.

but crane usage was not modelled, causing unplanned changeover collisions

and unaccounted idle time.

Ad-hoc Safety Stock

Safety stock replenishment was reactive; shortages were discovered at the dispatch

stage rather than at plan generation, triggering emergency short runs at high

changeover cost.

Inconsistent RM Colour Batching

Same RM colour batching critical for minimising purge waste between runs was

applied inconsistently, inflating material cost and downtime across the line.

Unrecovered Idle Time

Idle machine time between OEM production runs was not systematically recovered; safety stock and carry-forward demand were never filled into available gaps, leaving 20–30% of capacity unused.

Manual Mid-Shift Replanning

Mid-shift disruptions (machine breakdowns, rushed OEM call-offs) required full manual replanning from scratch consuming 2–3 hours and producing a suboptimal output every time.

Long Planning Cycle

Planning a two-shift schedule took 5–7 hours of senior planner time with no guarantee of optimality and no what-if scenario capability for the planning team.

No Scenario Comparison

Planners could not run multiple scenarios across demand mixes, OEM priorities, or

safety-stock levels before committing to a plan; trade-offs were made without

quantitative comparison.


THE SOLUTION

Intelligent Production Planning Platform

Enmovil deployed its constraint-aware production planning engine, combining a CP-SAT optimisation solver with a rule-based heuristic planner. The platform ingests demand, inventory, machine state, and

configuration in a single run and outputs a fully sequenced, gap free multi-machine schedule with OEM delivery assurance and safety-stock recovery built in.

01 Configure & Snapshot

Define machines, mould–part compatibility matrix, RM colour groups, OEM delivery windows, and safety-stock targets. Capture mid-shift WIP state active part, remaining quantity, mould on machine as a snapshot to seed replanning without disruption.

02 Optimise & Plan

CP-SAT solver allocates OEM demand across machines respecting all hard constraints. Heuristic post processor fills remaining idle gaps with safety stock recovery, carry forward demand, and pull ahead production maximising utilisation across the full planning horizon.

03 Execute & Monitor

Output a Gantt-format machine schedule, shortage alerts with procurement triggers, and

utilisation analytics. Midshift events trigger a re-plan from snapshot; the

revised schedule is ready in under 5 minutes planners review, not rebuild.

CAPABILITIES DELIVERED

1. Constraint-Aware Scheduling Engine

• CP-SAT solver models all hard constraints simultaneously: machine qualification, mould compatibility, RM colour sequencing, OEM daywindow enforcement, minimum batch sizes, and setup times.

• Multi-OEM demand allocated within strict delivery windows with configurable rollover

tolerance preventing late production from silently slipping past committed dates.

• Same-RM colour batching groups compatible parts into contiguous runs, minimising purge cycles and associated material waste.


2. Bay Crane Serialisation

• Each production bay has a shared overhead crane used for mould

changeovers. The planner serialises crane usage per bay two no machines in the same bay can execute a changeover simultaneously.

• Crane contention is resolved at plan generation, not at execution eliminating

unplanned changeover delays and the idle gaps they previously caused.

• Changeover sequencing respects mould transport times and crane availability

windows in addition to machine state.

3.Idle-Gap Recovery & Safety-Stock Fill

• Heuristic planner scans every machine timeline for idle gaps and fills them in priority

order: OEM carry-forward, safety-stock shortfall recovery, pull ahead production, idle-continuation.

• Safety-stock recovery uses the same mould currently on the machine where possible

eliminating unnecessary changeovers and maximising the productive value of each gap.

• Gaps below a configurable minimum threshold are left as planned maintenance

windows rather than forced into micro-changeovers.

4. Snapshot-Driven Mid-Shift Replanning

• At any point in a shift, the planner captures a machine snapshot: part in progress, quantity completed, mould mounted, and time remaining. The next plan seeds directly from this state.

• Prior-day WIP is projected forward into the new shift timeline ensuring in-progress jobs are completed before new demand is allocated, with no double-counting of capacity.

• Full 24-machine, two-shift schedule generated in under 90 seconds enabling planners to run multiple scenarios before committing to a plan.

KEY VALUE DRIVERS

Machine Utilisation & Throughput

• Idle-gap recovery sub-passes systematically reclaim 20–30% of previously wasted machine time per shift without adding assets or headcount. • Same-RM batching and OEM family grouping reduce per-shift changeover count by 44%, directly converting changeover time into productive run time. • At 92% utilisation, the same 24-machine line delivers output equivalent to ~33 machines at the previous 63% baseline ,deferring significant capex.

OEM Service Level & Delivery Assurance

Strict OEM delivery window enforcement ensures committed quantities are always scheduled within the promised date range not silently rolled over. • Safety-stock recovery fills idle gaps with parts approaching minimum inventory thresholds, reducing stockout risk before it reaches the despatch stage. • On-time delivery improved from 74% to 97% directly reducing premium freight, linestop penalties, and customer escalations.

Material Efficiency & Inventory

RM colour-grouped sequencing reduces purge cycles per shift, cutting raw material waste by ~41% and associated machine downtime. • Demand-driven scheduling eliminates over-production buffers; pull-ahead production only fills genuine idle gaps reducing WIP inventory by ~32%. • Safety-stock gaps quantified at plan generation, enabling procurement to act Planning Agility & Operational Continuity

Planning Agility & Operational Continuity

• Snapshot-driven replanning compresses mid-shift response from 2–3 hours to under 5 minutes planners adapt to breakdowns and rush orders in real time. • Full planning cycle runs in under 90 seconds, enabling scenario comparison across demand mixes, OEM priorities, and safety-stock levels before committing. • Shift-to-shift WIP continuity maintained automatically in-progress jobs carry forward without manual re-entry or capacity double-counting.

“We used to spend the first hour of every shift figuring out what the previous shift left behind and rebuilding the plan. Now the system hands us a complete, optimised schedule in minutes and every idle gap on every machine is already filled. The planner's job has shifted from building the plan to reviewing it.”

Production Planning Manager, Tier-1 Automotive Components Manufacturer
Your next step

Put CADDIE over what you already run.

Nothing ripped out. Leave your work email and we’ll show you CADDIE on your own operation, in 15 minutes.

Next: your name and company. That's all.

Air transport
Sea transport
Road transport